# CMBS Loan Due Diligence Requirements

**Commercial Mortgage-Backed Securities (CMBS)** loans require the most rigorous due diligence in commercial real estate financing. B-piece investors (governed by standards from the [CRE Finance Council](https://www.crefc.org/)) who take on the highest risk demand strict adherence to environmental and property standards to protect against loan default and liability.

## Overview of CMBS Lending

CMBS loans are commercial mortgages that are pooled and sold as securities to investors. Because these loans are securitized and sold in the secondary market, due diligence requirements are standardized and exceptionally thorough.

### Conduit Loans

The most common CMBS loans, pooled from multiple originators into securities.

- Typical loan size: $2M - $50M
- Fixed rate, 10-year terms common
- Non-recourse with carve-outs
- Standardized documentation

### Single-Asset / Single-Borrower

Large loans secured by a single property or portfolio from one borrower.

- Loan size: $75M+
- Trophy or institutional assets
- Customized structures possible
- Enhanced due diligence

**B-Piece Buyers:** CMBS deals have tranches rated from AAA down to unrated "B-piece." B-piece buyers review every loan in the pool and can reject (or "kick out") loans with environmental or property issues.

## Phase 1 ESA Requirements

CMBS lenders require Phase 1 Environmental Site Assessments for all loans without exception. The stringent requirements reflect B-piece investor expectations and the need to satisfy rating agencies.

### Mandatory Requirements

- Phase 1 ESA required for **100%** of CMBS loans
- Must comply with ASTM E1527-21 (current standard)
- Must satisfy EPA All Appropriate Inquiries (AAI)
- Site visit within 180 days of loan closing
- Report within 1 year of closing
- No RECs or all RECs must be resolved

### CMBS-Specific Standards

Beyond ASTM requirements, CMBS lenders typically require additional environmental due diligence items that may not be standard in other loan programs.

Standard ASTM E1527-21

AAI Compliance 40 CFR Part 312 required

Site Visit Age 180 days maximum

Report Age 1 year maximum (often 6 months preferred)

Reliance Lender, servicer, trustee, certificate holders

EP Insurance $2+ million E\&O typically required

### REC Resolution Requirements

Unlike some loan programs that may accept RECs with mitigation, CMBS loans typically require all Recognized Environmental Conditions to be fully resolved before closing.

Loan Rejection Unresolved RECs typically result in B-piece kickout

Phase 2 Required Any REC requires Phase 2 ESA to quantify risk

HREC/CREC Historical or Controlled RECs may be acceptable with documentation

### Additional Environmental Screens

CMBS due diligence commonly includes screening for hazards beyond the Phase 1 ESA scope:

#### Vapor Intrusion

Screening or assessment if volatile compounds are present on or near the site.

#### Radon

Testing in EPA Zones 1-2 and often Zone 3 for multifamily/office properties.

#### Lead-Based Paint

Assessment for pre-1978 residential properties including multifamily.

#### Asbestos

Survey typically required for pre-1981 construction on all property types.

#### Mold

Assessment required if any evidence of water intrusion or visible growth.

#### Wetlands

Delineation may be required if wetland indicators are present on site.

## ALTA Survey Requirements

CMBS loans require a current ALTA/NSPS Land Title Survey meeting the 2026 Minimum Standard Detail Requirements (effective February 23, 2026). The survey must be certified to all parties in the securitization chain and dated within 30 days of closing in most cases.

### Survey Timing

Unlike other loan programs, CMBS typically requires surveys to be very recent:

Standard ALTA/NSPS 2026 Minimum Standards

Survey Age 30 days preferred; 90 days maximum

Certification Lender, servicer, title company, borrower

Exception Removal Must enable removal of standard survey exceptions

[Configure Table A for CMBS](https://apprais.ai/alta-table-a-configurator/)

## Where This Table A List Comes From

Not enumerated by the programme. The list below is our composite.

There is no CMBS standard to cite. Requirements are set deal by deal by the originator, the B-piece buyer and the rating agencies, and none of them publish a Table A list. This list is our composite of what conduit lenders commonly ask for, built from the agency set plus item 11a. Treat it as a starting point for the conversation, not a requirement.

**1** Monuments**2** Address**3** Flood Zone**4** Gross Land Area**6a** Zoning Classification**6b** Zoning Setbacks Depicted**7a** Building Exterior Dimensions**8** Substantial Features**9** Parking Spaces**10** Party Walls**11a** Underground Utilities (Client Plans)**13** Adjoining Owners**16** Evidence of Recent Work**18** Offsite Easements**20** Encroachment Summary Table (2026)

- Survey age

  Typically 180 days

- Loan types covered

  Conduit, Single-Asset Single-Borrower

- Primary source

  None published

Your property type adds items on top of this: [Table A items by property type](https://apprais.ai/learn/table-a-items-by-property-type/). Compare all 7 programmes side by side in [the lender comparison](https://apprais.ai/learn/lenders/compared/), or build the merged list in [the configurator](https://apprais.ai/alta-table-a-configurator/).

## Property Condition Assessment

What one costs and why it is quoted per square foot: [property condition assessment cost](https://apprais.ai/property-condition-assessment-cost/). The governing standard is [ASTM E2018-24](https://apprais.ai/learn/what-is-astm-e2018/).

A comprehensive Property Condition Assessment is required for all CMBS loans. The PCA determines capital needs, replacement reserves, and can impact loan sizing.

### PCA Requirements

- Required for 100% of CMBS loans
- ASTM E2018 standard compliance
- 12-year capital needs projection (minimum)
- Immediate repairs must be escrowed or completed
- Replacement reserve analysis
- Accessibility compliance review

### Impact on Loan Sizing

PCA findings directly affect CMBS loan terms:

Immediate Repairs 125% escrow required at closing

Short-Term Repairs Must be funded from operations or reserves

Replacement Reserves Annual funding per PCA recommendations

Deferred Maintenance May reduce loan proceeds

## Seismic Risk Assessment

For properties in seismic zones, CMBS requires a Probable Maximum Loss (PML) or Scenario Expected Loss (SEL) study per ASTM E2026.

### When Seismic Assessment is Required

- Properties in Seismic Design Categories D, E, or F
- California, Pacific Northwest, Alaska, Hawaii, New Madrid zone
- PML/SEL over 20% typically requires earthquake insurance
- ASTM E2026 or E2557 standards

PML Threshold 20% (insurance trigger)

SEL Metric Preferred by some servicers

Standards ASTM E2026 or E2557

## Appraisal Requirements

CMBS appraisals must be prepared by MAI-designated appraisers with specific property type experience. The appraisal is critical for loan sizing and rating agency analysis.

Appraiser MAI designation required

Standard USPAP + FIRREA

Approaches All three approaches required

Report Age 90-120 days at closing

As-Is & As-Stabilized Both values if property not stabilized

## Zoning & Compliance Reports

CMBS loans typically require a third-party zoning report confirming legal use, building compliance, and identifying any violations.

### Zoning Report Contents

- Current zoning classification
- Permitted uses vs. actual use
- Setback, height, FAR compliance
- Parking requirement compliance
- Non-conforming status (if applicable)
- Open violations search

CMBS diligence usually pairs this with a [property condition assessment](https://apprais.ai/property-condition-assessment-cost/), which reports the building's physical deficiencies and reserve needs. Different report, same deadline.

Budget the report as its own line. It is not part of the survey fee, and Table A Item 6 only transcribes onto the plat what a report you supply already says. Ordering it late is the usual reason a survey misses a closing date: see [zoning compliance reports and Table A Item 6](https://apprais.ai/learn/zoning-compliance-report/).

Securitised portfolios are usually reviewed as a set, so consistency between assets matters more than the per-asset price. Only a few firms cover both the survey and the environmental scope nationwide: see [nationwide single-vendor providers](https://apprais.ai/providers/nationwide/).

## Timeline Considerations

CMBS closings require extensive coordination. All reports must be completed, reviewed, and approved before closing and securitization.

2-3 weeks Phase 1 ESA

2-4 weeks ALTA Survey

2-3 weeks PCA

2-3 weeks Appraisal

1-2 weeks Seismic/Zoning

60-90 days Total Process

### B-Piece Review Period

After all due diligence is complete, B-piece buyers review the loan package. This adds 1-2 weeks to the timeline. Loans with environmental or property issues may be kicked out, requiring resolution or deal termination.

## Frequently Asked Questions

### What is a B-piece buyer in CMBS?

B-piece buyers purchase the lowest-rated, highest-risk tranches of CMBS securities. Because they bear the first loss if loans default, B-piece buyers conduct extensive due diligence review of every loan in the pool and can reject ("kick out") loans with unacceptable environmental or property risks.

### Why are CMBS environmental requirements stricter?

CMBS loans are non-recourse and securitized, meaning the property is the only collateral and multiple investors hold the debt. Environmental contamination can render a property worthless or create massive liability exposure. Rating agencies and investors demand thorough environmental due diligence to protect against these risks.

### Can a CMBS loan close with RECs on the Phase 1 ESA?

Generally no. CMBS loans typically require all RECs to be resolved through Phase 2 investigation and any necessary remediation. Historical RECs (HRECs) and Controlled RECs (CRECs) may be acceptable if properly documented, but active RECs will almost always result in loan rejection by B-piece buyers.

### How recent must a CMBS survey be?

CMBS lenders typically require surveys dated within 30 days of closing, though some accept surveys up to 90 days old with a recertification. The survey must meet current ALTA/NSPS 2026 standards and include an extensive list of Table A items.

### What happens if the PCA finds deferred maintenance?

Immediate repairs must be completed or escrowed at 125% of estimated cost. Significant deferred maintenance may reduce loan proceeds. The PCA findings also establish required replacement reserve contributions during the loan term.

### Is earthquake insurance required for CMBS loans?

Earthquake insurance is required when the seismic risk assessment shows a Probable Maximum Loss (PML) or Scenario Expected Loss (SEL) exceeding 20%. This is common for properties in California, the Pacific Northwest, and other high seismic risk areas.

## Related Resources

- [Freddie Mac Requirements](https://apprais.ai/learn/lenders/freddie-mac-requirements/)
- [All lender survey requirements compared](https://apprais.ai/learn/lenders/compared/)
- [What is a Phase 1 ESA?](https://apprais.ai/learn/what-is-phase-1-esa/)
- [What is an ALTA Survey?](https://apprais.ai/learn/what-is-alta-survey/)
- [What is ALTA Table A?](https://apprais.ai/learn/what-is-alta-table-a/)
- [REC Types: REC, HREC, CREC](https://apprais.ai/learn/rec-types/)
- [ALTA Table A Configurator](https://apprais.ai/alta-table-a-configurator/)
- [Phase 1 ESA Cost Calculator](https://apprais.ai/phase-1-environmental-calculator/)
- [Fannie Mae Requirements](https://apprais.ai/learn/lenders/fannie-mae-requirements/)
- [HUD/FHA Requirements](https://apprais.ai/learn/lenders/hud-fha-requirements/)

### CMBS Quick Summary

Commercial Mortgage-Backed Securities

- **Phase 1 ESA:** Required, no RECs
- **Standard:** ASTM E1527-21
- **Survey Age:** 30 days preferred
- **PCA:** Required (ASTM E2018)
- **Timeline:** 60-90 days

#### Configure Your Survey

Find which Table A items your CMBS lender requires.

[Open Configurator →](https://apprais.ai/alta-table-a-configurator/)

#### Estimate ESA Cost

Get a quick estimate for Phase 1 ESA based on property type.

[Calculate Cost →](https://apprais.ai/phase-1-environmental-calculator/)

#### Other Lender Guides

- [Fannie Mae](https://apprais.ai/learn/lenders/fannie-mae-requirements/)
- [HUD/FHA](https://apprais.ai/learn/lenders/hud-fha-requirements/)
- [SBA Loans](https://apprais.ai/learn/lenders/sba-loan-requirements/)