---
title: "Ohio Phase 1 ESA Cost 2026: $1,710-$4,500 | Compare Quotes"
description: "Ohio Phase 1 ESA cost: $1,710-$4,500 in 2026 (ASTM E1527-21). City-by-city pricing, AAI requirements, and free quotes from local consultants."
canonical: "https://apprais.ai/phase-1-environmental-cost/ohio/"
---

[Home](https://apprais.ai/) / [Phase 1 ESA Cost](https://apprais.ai/phase-1-environmental-cost/) / Ohio

Map © [OpenStreetMap](https://www.openstreetmap.org/copyright) contributors

Estimated Cost

$1,710 – $4,500

-10% vs national average

$1.5K $6K

Nat'l Avg

Last updated: 2026-10-20

[Find Local Providers](https://apprais.ai/providers/)

# Phase 1 ESA Cost in Ohio

## Quick Price Estimate

**Typical Range:** $1,710 - $4,500

*Ohio prices are 10% lower than the national average due to regional cost factors.*

## Ohio Phase 1 ESA Pricing Table

| Service Level | Turnaround         | Price Range                                          |
| ------------- | ------------------ | ---------------------------------------------------- |
| **Standard**  | 2-3 weeks          | $1,710 - $4,500                                      |
| **Rush**      | Faster, on request | Quoted per project (published fees: +$500 to $1,000) |

*Prices vary based on property size, complexity, and specific requirements.*

## Ohio Phase 1 ESA Overview

A [Phase 1 Environmental Site Assessment (ESA)](https://apprais.ai/learn/what-is-phase-1-esa/) in Ohio evaluates potential environmental contamination through historical records review, site reconnaissance, and interviews. This assessment satisfies the “[All Appropriate Inquiries](https://apprais.ai/learn/all-appropriate-inquiries/)” (AAI) requirement under [CERCLA](https://apprais.ai/learn/cercla-liability/), providing innocent landowner liability protection for property purchasers.

Phase 1 ESAs in Ohio follow the ASTM E1527-21 standard, which was updated in 2021 to include emerging contaminants like PFAS. All assessments must be conducted by qualified Environmental Professionals as defined by the AAI rule.

### What’s Included in an Ohio Phase 1 ESA

- **Historical Records Review:** Examination of aerial photographs, fire insurance (Sanborn) maps, city directories, building permits, and historical topographic maps
- **Regulatory Database Search:** Federal, Ohio state, and local environmental records searched within ASTM-specified distances
- **Site Reconnaissance:** Physical inspection of the property and adjoining properties to identify potential contamination sources
- **Interviews:** Discussions with current and past property owners, operators, occupants, and local government officials
- **Report and Opinion:** Professional assessment identifying any [Recognized Environmental Conditions (RECs)](https://apprais.ai/learn/what-is-rec/), Controlled RECs, or Historical RECs

### What Affects Ohio Phase 1 ESA Pricing

- **Property History:** Former industrial, gas station, or dry cleaner use significantly increases scope
- **Property Size:** Larger properties require more extensive site reconnaissance
- **Records Availability:** Some Ohio counties have better environmental records access than others
- **Number of Buildings:** Multiple structures require more inspection time
- **Turnaround:** Rush work is quoted per project; the few firms that publish a fee add about $500 to $1,000.
- **[Vapor Intrusion](https://apprais.ai/learn/vapor-intrusion/) Screening:** May be required for properties near known contamination

## Ohio Commercial Real Estate Market

Ohio’s industrial heritage, particularly in the Cleveland-Akron and Cincinnati areas, creates environmental considerations for CRE transactions. The state’s history of automotive manufacturing, steel production, rubber manufacturing, and chemical production has left legacy contamination in many industrial areas. The [Ohio Environmental Protection Agency (Ohio EPA)](https://epa.ohio.gov/divisions-and-offices/environmental-response-revitalization) administers the state’s cleanup programs. Ohio has been active in brownfield redevelopment, particularly in its Rust Belt cities where former industrial sites are being converted to new uses.

## Ohio Regulatory Environment

The [Ohio Environmental Protection Agency (Ohio EPA)](https://epa.ohio.gov/divisions-and-offices/environmental-response-revitalization) manages environmental cleanup programs including the Voluntary Action Program (VAP), which provides a No Further Action (NFA) letter and covenant not to sue upon completion of cleanup. Ohio’s VAP is one of the more developed voluntary cleanup programs in the country. The state also maintains the Master Sites List database for tracking contaminated properties. Ohio requires Certified Professionals (CPs) to oversee voluntary cleanup activities.

## What Drives Phase 1 ESA Costs in Ohio

Phase 1 ESA costs in Ohio are generally at or slightly below national averages. Properties in former industrial areas of Cleveland, Akron, and Cincinnati may require expanded assessment scope. Ohio’s extensive manufacturing history means many sites have environmental histories that require thorough investigation. The state’s coal mining regions in southeastern Ohio may have additional concerns related to acid mine drainage and mining subsidence.

## Phase 1 ESA by City in Ohio

| City                                                                       | Price Range     | Population |
| -------------------------------------------------------------------------- | --------------- | ---------- |
| [Columbus](https://apprais.ai/phase-1-environmental-cost/columbus-oh/)     | $1,932 - $5,086 | 923,987    |
| [Cleveland](https://apprais.ai/phase-1-environmental-cost/cleveland-oh/)   | $1,761 - $4,636 | 373,590    |
| [Cincinnati](https://apprais.ai/phase-1-environmental-cost/cincinnati-oh/) | $1,676 - $4,410 | 310,334    |
| [Toledo](https://apprais.ai/phase-1-environmental-cost/toledo-oh/)         | $1,796 - $4,726 | 262,815    |

## Phase 1 ESA by Property Type in Ohio

| Property Type                                                                                      | Price Range     | Environmental Risk                                                                                                                                                                       |
| -------------------------------------------------------------------------------------------------- | --------------- | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| [Agricultural / Farm](https://apprais.ai/phase-1-environmental-cost/agricultural/)                 | $1,710 - $4,500 | [Moderate](https://apprais.ai/learn/environmental-risk-levels/#medium) — [Phase 2](https://apprais.ai/learn/what-is-phase-2-esa/) if [RECs](https://apprais.ai/learn/what-is-rec/) found |
| Agriculture                                                                                        | $2,052 - $5,400 | [Moderate](https://apprais.ai/learn/environmental-risk-levels/#medium) — [Phase 2](https://apprais.ai/learn/what-is-phase-2-esa/) if [RECs](https://apprais.ai/learn/what-is-rec/) found |
| [Assisted Living / Senior Housing](https://apprais.ai/phase-1-environmental-cost/assisted-living/) | $1,710 - $4,500 | [Low](https://apprais.ai/learn/environmental-risk-levels/#low) — [Phase 2](https://apprais.ai/learn/what-is-phase-2-esa/) rarely needed                                                  |
| [Auto Repair / Body Shop](https://apprais.ai/phase-1-environmental-cost/auto-repair/)              | $2,223 - $5,850 | [Very High](https://apprais.ai/learn/environmental-risk-levels/#very-high) — [Phase 2](https://apprais.ai/learn/what-is-phase-2-esa/) typically required                                 |
| [Brownfield](https://apprais.ai/phase-1-environmental-cost/brownfield/)                            | $3,078 - $8,100 | [Very High](https://apprais.ai/learn/environmental-risk-levels/#very-high) — [Phase 2](https://apprais.ai/learn/what-is-phase-2-esa/) typically required                                 |
| [Car Wash](https://apprais.ai/phase-1-environmental-cost/car-wash/)                                | $2,052 - $5,400 | [Very High](https://apprais.ai/learn/environmental-risk-levels/#very-high) — [Phase 2](https://apprais.ai/learn/what-is-phase-2-esa/) typically required                                 |
| [Church / Religious Facility](https://apprais.ai/phase-1-environmental-cost/church/)               | $1,710 - $4,500 | [Low](https://apprais.ai/learn/environmental-risk-levels/#low) — [Phase 2](https://apprais.ai/learn/what-is-phase-2-esa/) rarely needed                                                  |
| [Data Center](https://apprais.ai/phase-1-environmental-cost/data-center/)                          | $1,967 - $5,176 | [Low](https://apprais.ai/learn/environmental-risk-levels/#low) — [Phase 2](https://apprais.ai/learn/what-is-phase-2-esa/) rarely needed                                                  |

[View all property types →](https://apprais.ai/phase-1-environmental-cost/)

## Find Phase 1 ESA Providers in Ohio

We have **verified providers** serving Ohio. These include both national firms with Ohio coverage and local specialists who know the Ohio market.

When selecting a provider in Ohio, consider:

- **Turnaround time** that meets your closing deadline
- **Experience** with your specific property type
- **Lender familiarity** with your financing requirements
- **Ohio licensing** and professional credentials

[View Ohio Providers →](https://apprais.ai/providers/phase-1-environmental/ohio/)

## Insider Tips for Ohio

For Ohio properties with known contamination, the Voluntary Action Program (VAP) provides a clear path to liability protection through the No Further Action letter. Ohio’s competitive consulting market means you can often get competitive bids. For properties in former Rust Belt industrial areas, budget for potential expanded assessment scope and investigate VAP eligibility early in the process.

## Frequently Asked Questions

### How much does a phase 1 esa cost in Ohio?

Phase 1 ESA costs in Ohio typically range from $1,710 to $4,500 for standard turnaround. Rush work is quoted per project; the few firms that publish a fee add about $500 to $1,000. Pricing depends on property size, complexity, and specific requirements.

### How long does a phase 1 esa take in Ohio?

Standard turnaround in Ohio is 2-3 weeks. Rush Phase 1 reports are quoted per project. The few firms that publish a fee add about $500 to $1,000 ([A3 Environmental](https://go.a3e.com/phase1-esa/v9.html), [Phase 1 Environmental Consulting](https://phaseonereport.com/)). Ask for the rush fee in writing. Properties with complicated histories may require extended research time.

### Do I need a phase 1 esa in Ohio?

Phase 1 ESAs are required for most commercial property transactions in Ohio to establish environmental liability protection under [CERCLA](https://apprais.ai/learn/cercla-liability/). This includes SBA loans, bank financing, and institutional investment. The Phase 1 ESA provides “innocent landowner” protection if contamination is later discovered.

### What’s the difference between phase 1 esa cost in Ohio major cities vs rural areas?

Ohio’s major metropolitan areas like Columbus and Cleveland typically have higher phase 1 esa costs due to greater demand, higher labor costs, and more complex properties. Rural areas may have lower base prices but could face longer turnaround times due to fewer local providers.

### Can I get a phase 1 esa quote before making an offer in Ohio?

Yes, most Ohio providers offer free quotes based on property address, size, and your specific requirements. Sharing what you know about the property’s history helps the consultant scope the project correctly.

### What Ohio credentials should I look for?

Look for an Environmental Professional (EP) as defined by the AAI rule. They should have relevant education plus experience in environmental site assessments. Many Ohio consultants also hold Professional Engineer (PE) or Professional Geologist (PG) licenses.

## Related Pages

- [National Phase 1 ESA Cost Overview](https://apprais.ai/phase-1-environmental-cost/)
- [Ohio ALTA Survey Cost](https://apprais.ai/alta-survey-cost/ohio/)
- [Phase 1 ESA Guide](https://apprais.ai/learn/what-is-phase-1-esa/)
- [Phase 1 ESA Calculator](https://apprais.ai/phase-1-environmental-calculator/)
- [Phase 1 ESA Providers Compared](https://apprais.ai/phase-1-esa-providers-compared/)

### Learn More

- [Who Pays for Due Diligence?](https://apprais.ai/learn/who-pays-for-due-diligence/)
- [Due Diligence Timeline](https://apprais.ai/learn/due-diligence-timeline/)
- [What is a Phase 1 ESA?](https://apprais.ai/learn/what-is-phase-1-esa/)
- [What is a Phase 2 ESA?](https://apprais.ai/learn/what-is-phase-2-esa/)
- [All Appropriate Inquiries (AAI)](https://apprais.ai/learn/all-appropriate-inquiries/)
- [CERCLA Liability Protection](https://apprais.ai/learn/cercla-liability/)
- [Understanding RECs](https://apprais.ai/learn/what-is-rec/)
- [Environmental Liens](https://apprais.ai/learn/environmental-liens/)

If this Phase 1 identifies a [Recognized Environmental Condition](https://apprais.ai/learn/what-is-rec/), the next step is a [Phase 2 ESA in Ohio](https://apprais.ai/phase-2-environmental-cost/ohio/) — soil and groundwater sampling, $5,400–$18,000.

## Who Provides Phase 1 ESAs in Ohio

3 firms are based in or specifically cover Ohio, plus 25 national firms that cover all 50 states. Surveying and environmental work are licensed state by state, so confirm which entity will sign your report before commissioning.

The reputation word beside each firm is our own band across the customer review sources we hold for it, not any platform's score restated. Each provider page names the sources behind it and links out to them.

### Covering Ohio specifically

[A3 Environmental Consultants (A3E) Our read Positive $2,200 to $4,000 HQ IL ](https://apprais.ai/providers/a3-environmental/)[AAI Environmental Corporation Our read No reviews $1,500 to $5,000 HQ TN ](https://apprais.ai/providers/aai-environmental/)[Site Assessors Nationwide Our read No reviews HQ NC](https://apprais.ai/providers/site-assessors-nationwide/)

### National firms covering Ohio

[AEI Consultants](https://apprais.ai/providers/aei-consultants/), [American National](https://apprais.ai/providers/american-national/), [Andersen Environmental](https://apprais.ai/providers/andersen-environmental/), [Apex Companies](https://apprais.ai/providers/apex-companies/), [BBG Real Estate Services](https://apprais.ai/providers/bbg/), [BBJ Group](https://apprais.ai/providers/bbj-group/), [Blew & Associates P.A.](https://apprais.ai/providers/blew-associates/), [Bowman Consulting Group](https://apprais.ai/providers/bowman/), [Bureau Veritas (BVNA)](https://apprais.ai/providers/bureau-veritas/), [CREtelligent](https://apprais.ai/providers/cretelligent/), [EBI Consulting](https://apprais.ai/providers/ebi-consulting/), [ECS Limited](https://apprais.ai/providers/ecs-limited/), [Essel Environmental](https://apprais.ai/providers/essel-environmental/), [GEO Forward](https://apprais.ai/providers/geo-forward/), [GZA GeoEnvironmental](https://apprais.ai/providers/gza-geoenvironmental/), [Hillmann Consulting](https://apprais.ai/providers/hillmann-consulting/), [National Due Diligence Services](https://apprais.ai/providers/national-due-diligence-services/), [NV5](https://apprais.ai/providers/nv5/), [Partner Engineering and Science](https://apprais.ai/providers/partner-esi/), [Phase 1 Environmental Consulting](https://apprais.ai/providers/phase-1-environmental-consulting/), [Roux Associates](https://apprais.ai/providers/roux-associates/), [RSB Environmental (Alliance Technical Group)](https://apprais.ai/providers/rsb-environmental/), [SCS Engineers](https://apprais.ai/providers/scs-engineers/), [Terracon](https://apprais.ai/providers/terracon/), [TRC Companies](https://apprais.ai/providers/trc-companies/).

### Ohio markets we price

[Columbus](https://apprais.ai/phase-1-environmental-cost/columbus-oh/), [Cleveland](https://apprais.ai/phase-1-environmental-cost/cleveland-oh/), [Cincinnati](https://apprais.ai/phase-1-environmental-cost/cincinnati-oh/), [Toledo](https://apprais.ai/phase-1-environmental-cost/toledo-oh/).

**Request Phase 1 ESA quotes for a Ohio property.** The quote form opens with Phase 1 ESA and Ohio already selected. Average response time is 24 to 48 hours.

[Get free quotes](https://apprais.ai/get-quote/?service=phase-1-esa\&state=ohio)

[See how Ohio ranks in the Phase 1 ESA Cost Index →](https://apprais.ai/phase-1-environmental-cost-index/)
