---
title: "Printing Phase 1 ESA Cost (2026)"
description: "Printing phase 1 esa cost 2026: $2,375-$6,250 (high risk). Compare free quotes from vetted environmental consultants."
canonical: "https://apprais.ai/phase-1-environmental-cost/printing/"
---

[Home](https://apprais.ai/) / [Phase 1 ESA Cost](https://apprais.ai/phase-1-environmental-cost/) / Printing / Graphics Facility

Map © [OpenStreetMap](https://www.openstreetmap.org/copyright) contributors

Estimated Cost

$2,375 – $6,250

+25% vs national average

$1.5K $6K

Nat'l Avg

Last updated: 2026-10-20

[Find Local Providers](https://apprais.ai/providers/)

# Phase 1 ESA Cost for Printing / Graphics Facility Properties

## Quick Price Estimate

**Typical Range:** $2,375 - $6,250

*Printing / Graphics Facility properties typically cost 25% more than standard properties due to elevated risk factors.*

## Why Printing / Graphics Facility Properties Cost More

Printing / Graphics Facility properties have high environmental risk. Solvents, inks, chemical waste

### Environmental Risk: [High](https://apprais.ai/learn/environmental-risk-levels/#high) — [Phase 2](https://apprais.ai/learn/what-is-phase-2-esa/) often recommended

**Key Risk Factors:** Solvents, inks, chemical waste

## Pricing by Scenario

| Scenario                   | Typical Cost Range |
| -------------------------- | ------------------ |
| Standard property          | $2,375 - $6,250    |
| Complex property           | $2,731 - $7,188    |
| Property with known issues | $3,088 - $8,126    |

## What to Expect

### Phase 1 ESA for Printing / Graphics Facility

A Phase 1 Environmental Site Assessment for printing / graphics facility properties includes:

- **Historical records review** - Sanborn maps, aerial photographs, city directories
- **Regulatory database search** - Federal, state, and local environmental records
- **Site reconnaissance** - Physical inspection of property and adjacent sites
- **Interviews** - Current/past owners, operators, government officials
- **Report and opinion** - Assessment of Recognized Environmental Conditions (RECs)

**Special Considerations for Printing / Graphics Facility:**

- Phase 2 ESA is often recommended or required
- Additional records research may be needed
- Vapor intrusion assessment may be warranted
- Budget for potential remediation costs

## Timeline

| Service Level | Turnaround         | Cost Impact                                          |
| ------------- | ------------------ | ---------------------------------------------------- |
| Standard      | 2-3 weeks          | Base price                                           |
| Rush          | Faster, on request | Quoted per project (published fees: +$500 to $1,000) |

**Note:** High-risk properties like printing / graphics facility may require additional time for thorough investigation. Rush timelines may not always be available.

## Phase 1 ESA for Printing / Graphics Facility by State

- [Phase 1 ESA for Printing / Graphics Facility in California](https://apprais.ai/phase-1-environmental-cost/california/)
- [Phase 1 ESA for Printing / Graphics Facility in Texas](https://apprais.ai/phase-1-environmental-cost/texas/)
- [Phase 1 ESA for Printing / Graphics Facility in Arizona](https://apprais.ai/phase-1-environmental-cost/arizona/)
- [Phase 1 ESA for Printing / Graphics Facility in Florida](https://apprais.ai/phase-1-environmental-cost/florida/)
- [Phase 1 ESA for Printing / Graphics Facility in North Carolina](https://apprais.ai/phase-1-environmental-cost/north-carolina/)
- [Phase 1 ESA for Printing / Graphics Facility in Tennessee](https://apprais.ai/phase-1-environmental-cost/tennessee/)

## Frequently Asked Questions

### How much does a phase 1 esa cost for a printing / graphics facility?

Phase 1 ESA for printing / graphics facility properties typically costs $2,375 to $6,250. This is 25% higher than standard properties due to the high risk level.

### Why do printing / graphics facility properties cost more?

Printing / Graphics Facility properties are considered high risk. Solvents, inks, chemical waste

### Do I need a Phase 2 ESA for a printing / graphics facility?

Phase 2 ESA is often recommended for printing / graphics facility properties, especially if RECs are identified in the Phase 1 ESA.

## Lender Requirements for Printing / Graphics Facility Properties

### Risk Classification

Printing / Graphics Facility properties are classified as **High environmental risk** for Phase 1 ESA purposes — solvents, inks, chemical waste. This property type carries a **1.25× cost multiplier** versus standard commercial properties (chemical inks, solvents), resulting in a typical adjusted range of **$2,375–$6,250** nationally.

### What Lenders Require

High-risk property types require Phase 1 ESA under most lender programs. SBA’s SOP 50 10 lists printing, shooting ranges, scrap and recyclable material yards, and most manufacturing among its environmentally sensitive industries, so a 7(a) or 504 loan on that collateral starts with a Phase 1 regardless of loan size. Some entries are conditional: trucking only with service bays, truck washing or fuel tanks; funeral homes only with embalming or cremation on site; and many manufacturing types not at all if the work is assembly only. CMBS mortgage loan purchase agreements require the Phase 1 ESA to have been conducted within 12 months prior to loan origination. HUD/FHA requires Phase 1 ESA for all multifamily transactions and commercial properties under PCNA guidelines, with high-risk uses triggering additional review. A Phase 1 finding RECs at high-risk properties commonly leads to Phase 2 ESA requirements and may require environmental remediation or insurance prior to closing.

### Report Standards

All Phase 1 ESAs must follow [ASTM E1527-21](https://apprais.ai/learn/what-is-phase-1-esa/) — the current standard adopted in December 2022. Reports must be completed by a qualified Environmental Professional (EP) meeting the qualifications defined in the [AAI rule](https://apprais.ai/learn/all-appropriate-inquiries/). Lenders require the report to be addressed or include reliance language allowing them to rely on the findings. CMBS lenders typically require Phase I ESA within 12 months of loan origination. SBA accepts reports within one year of loan issuance. Under ASTM E1527-21, five time-sensitive components must be completed within 180 days of the acquisition/transaction date to invoke the innocent landowner defense.

## Related Property Types

- [Phase 1 ESA for Funeral Home / Mortuary](https://apprais.ai/phase-1-environmental-cost/funeral-home/)
- [Phase 1 ESA for Hospital](https://apprais.ai/phase-1-environmental-cost/hospital/)
- [Phase 1 ESA for Junkyard / Salvage Yard](https://apprais.ai/phase-1-environmental-cost/junkyard/)
- [Phase 1 ESA for Manufacturing Facility](https://apprais.ai/phase-1-environmental-cost/manufacturing/)

## Related Pages

- [National Phase 1 ESA Cost Overview](https://apprais.ai/phase-1-environmental-cost/)
- [ALTA Survey for Printing / Graphics Facility](https://apprais.ai/alta-survey-cost/printing/)
- [Phase 1 ESA Providers Compared](https://apprais.ai/phase-1-esa-providers-compared/)
- [Who Pays for Due Diligence?](https://apprais.ai/learn/who-pays-for-due-diligence/)
- [Environmental Risk Levels](https://apprais.ai/learn/environmental-risk-levels/)
- [What is a REC?](https://apprais.ai/learn/what-is-rec/)
- [All Appropriate Inquiries](https://apprais.ai/learn/all-appropriate-inquiries/)

## Other Property Types

Phase 1 ESA costs vary by what is on the site. Other property types we track: [Agricultural / Farm](https://apprais.ai/phase-1-environmental-cost/agricultural/), [Assisted Living / Senior Housing](https://apprais.ai/phase-1-environmental-cost/assisted-living/), [Auto Repair / Body Shop](https://apprais.ai/phase-1-environmental-cost/auto-repair/), [Brownfield](https://apprais.ai/phase-1-environmental-cost/brownfield/), [Self Storage](https://apprais.ai/phase-1-environmental-cost/self-storage/), [Shooting Range](https://apprais.ai/phase-1-environmental-cost/shooting-range/), [Trucking Terminal](https://apprais.ai/phase-1-environmental-cost/trucking-terminal/), [Vacant Land](https://apprais.ai/phase-1-environmental-cost/vacant-land/).

[Compare Printing / Graphics Facility Phase 1 ESA costs across property types and states in the Phase 1 ESA Cost Index →](https://apprais.ai/phase-1-environmental-cost-index/)
