---
title: "Phase 1 ESA Cost for Shooting Range | 2026 Pricing Guide"
description: "Phase 1 ESA for shooting range properties costs $2,565 - $6,750. Shooting Range properties have high environmental risk. Get pricing and find providers."
canonical: "https://apprais.ai/phase-1-environmental-cost/shooting-range/"
---

[Home](https://apprais.ai/) / [Phase 1 ESA Cost](https://apprais.ai/phase-1-environmental-cost/) / Shooting Range

Map © [OpenStreetMap](https://www.openstreetmap.org/copyright) contributors

Estimated Cost

$2,565 – $6,750

+35% vs national average

$1.5K $6K

Nat'l Avg

Last updated: 2026-10-20

[Find Local Providers](https://apprais.ai/providers/)

# Phase 1 ESA Cost for Shooting Range Properties

## Quick Price Estimate

**Typical Range:** $2,565 - $6,750

*Shooting Range properties typically cost 35% more than standard properties due to elevated risk factors.*

## Why Shooting Range Properties Cost More

Shooting Range properties have high environmental risk. Lead contamination from ammunition

### Environmental Risk: [High](https://apprais.ai/learn/environmental-risk-levels/#high) — [Phase 2](https://apprais.ai/learn/what-is-phase-2-esa/) often recommended

**Key Risk Factors:** Lead contamination from ammunition

## Pricing by Scenario

| Scenario                   | Typical Cost Range |
| -------------------------- | ------------------ |
| Standard property          | $2,565 - $6,750    |
| Complex property           | $2,950 - $7,762    |
| Property with known issues | $3,335 - $8,776    |

## What to Expect

### Phase 1 ESA for Shooting Range

A Phase 1 Environmental Site Assessment for shooting range properties includes:

- **Historical records review** - Sanborn maps, aerial photographs, city directories
- **Regulatory database search** - Federal, state, and local environmental records
- **Site reconnaissance** - Physical inspection of property and adjacent sites
- **Interviews** - Current/past owners, operators, government officials
- **Report and opinion** - Assessment of Recognized Environmental Conditions (RECs)

**Special Considerations for Shooting Range:**

- Phase 2 ESA is often recommended or required
- Additional records research may be needed
- Vapor intrusion assessment may be warranted
- Budget for potential remediation costs

## Timeline

| Service Level | Turnaround         | Cost Impact                                          |
| ------------- | ------------------ | ---------------------------------------------------- |
| Standard      | 2-3 weeks          | Base price                                           |
| Rush          | Faster, on request | Quoted per project (published fees: +$500 to $1,000) |

**Note:** High-risk properties like shooting range may require additional time for thorough investigation. Rush timelines may not always be available.

## Phase 1 ESA for Shooting Range by State

- [Phase 1 ESA for Shooting Range in California](https://apprais.ai/phase-1-environmental-cost/california/)
- [Phase 1 ESA for Shooting Range in Texas](https://apprais.ai/phase-1-environmental-cost/texas/)
- [Phase 1 ESA for Shooting Range in Arizona](https://apprais.ai/phase-1-environmental-cost/arizona/)
- [Phase 1 ESA for Shooting Range in Florida](https://apprais.ai/phase-1-environmental-cost/florida/)
- [Phase 1 ESA for Shooting Range in North Carolina](https://apprais.ai/phase-1-environmental-cost/north-carolina/)
- [Phase 1 ESA for Shooting Range in Tennessee](https://apprais.ai/phase-1-environmental-cost/tennessee/)

## Frequently Asked Questions

### How much does a phase 1 esa cost for a shooting range?

Phase 1 ESA for shooting range properties typically costs $2,565 to $6,750. This is 35% higher than standard properties due to the high risk level.

### Why do shooting range properties cost more?

Shooting Range properties are considered high risk. Lead contamination from ammunition

### Do I need a Phase 2 ESA for a shooting range?

Phase 2 ESA is often recommended for shooting range properties, especially if RECs are identified in the Phase 1 ESA.

## What to Include in Your Phase 1 ESA Request

When soliciting quotes from environmental consultants, provide the following to ensure accurate scoping and pricing:

- **Property address and APN** — enables the consultant to pre-screen regulatory databases before quoting
- **Property size** (acreage and building square footage) — larger sites require more reconnaissance time
- **Known or suspected environmental history** — prior uses, USTs, spills, or remediation you’re aware of
- **Lender name and loan program** — some lenders have specific report requirements (e.g., SBA, HUD, CMBS) that affect scope and who can sign
- **Required turnaround**: standard is 2-3 weeks. Rush work is quoted per project; the few firms that publish a fee add about $500 to $1,000.
- **Target closing date** — drives urgency and whether a reliance letter or update letter will be needed later

Getting quotes from at least two consultants is standard practice. Cheapest is not always best: a low quote from an inexperienced firm that misses a REC can cost far more in Phase 2 ESA and remediation than you saved on the Phase 1.

### Typical Phase 1 ESA Timeline

| Step                         | Duration                                   |
| ---------------------------- | ------------------------------------------ |
| Quote and contract execution | 1–3 days                                   |
| Regulatory database search   | 2–5 days                                   |
| Site reconnaissance visit    | 1 day (scheduled within 3–7 days)          |
| Historical records review    | 3–7 days (concurrent with database search) |
| Report drafting and review   | 3–5 days                                   |
| Final report delivery        | **14–21 days total (standard)**            |
| Rush delivery                | **5–10 days total**                        |

Under ASTM E1527-21, a Phase I ESA is presumed viable when conducted within 180 days prior to the acquisition or transaction date (not the site visit date). If more than 180 days pass between transaction and completion of key components, an update letter is required. CMBS and SBA programs each set their own independent validity windows (12 months and 1 year respectively).

## Lender Requirements for Shooting Range Properties

### Risk Classification

Shooting Range properties are classified as **High environmental risk** for Phase 1 ESA purposes — lead contamination from ammunition. This property type carries a **1.35× cost multiplier** versus standard commercial properties (lead contamination), resulting in a typical adjusted range of **$2,565–$6,750** nationally.

### What Lenders Require

High-risk property types require Phase 1 ESA under most lender programs. SBA’s SOP 50 10 lists printing, shooting ranges, scrap and recyclable material yards, and most manufacturing among its environmentally sensitive industries, so a 7(a) or 504 loan on that collateral starts with a Phase 1 regardless of loan size. Some entries are conditional: trucking only with service bays, truck washing or fuel tanks; funeral homes only with embalming or cremation on site; and many manufacturing types not at all if the work is assembly only. CMBS mortgage loan purchase agreements require the Phase 1 ESA to have been conducted within 12 months prior to loan origination. HUD/FHA requires Phase 1 ESA for all multifamily transactions and commercial properties under PCNA guidelines, with high-risk uses triggering additional review. A Phase 1 finding RECs at high-risk properties commonly leads to Phase 2 ESA requirements and may require environmental remediation or insurance prior to closing.

### Report Standards

All Phase 1 ESAs must follow [ASTM E1527-21](https://apprais.ai/learn/what-is-phase-1-esa/) — the current standard adopted in December 2022. Reports must be completed by a qualified Environmental Professional (EP) meeting the qualifications defined in the [AAI rule](https://apprais.ai/learn/all-appropriate-inquiries/). Lenders require the report to be addressed or include reliance language allowing them to rely on the findings. CMBS lenders typically require Phase I ESA within 12 months of loan origination. SBA accepts reports within one year of loan issuance. Under ASTM E1527-21, five time-sensitive components must be completed within 180 days of the acquisition/transaction date to invoke the innocent landowner defense.

## Related Property Types

- [Phase 1 ESA for Funeral Home / Mortuary](https://apprais.ai/phase-1-environmental-cost/funeral-home/)
- [Phase 1 ESA for Hospital](https://apprais.ai/phase-1-environmental-cost/hospital/)
- [Phase 1 ESA for Junkyard / Salvage Yard](https://apprais.ai/phase-1-environmental-cost/junkyard/)
- [Phase 1 ESA for Manufacturing Facility](https://apprais.ai/phase-1-environmental-cost/manufacturing/)

## Related Pages

- [National Phase 1 ESA Cost Overview](https://apprais.ai/phase-1-environmental-cost/)
- [ALTA Survey for Shooting Range](https://apprais.ai/alta-survey-cost/shooting-range/)
- [Phase 1 ESA Providers Compared](https://apprais.ai/phase-1-esa-providers-compared/)
- [Who Pays for Due Diligence?](https://apprais.ai/learn/who-pays-for-due-diligence/)
- [Environmental Risk Levels](https://apprais.ai/learn/environmental-risk-levels/)
- [What is a REC?](https://apprais.ai/learn/what-is-rec/)
- [All Appropriate Inquiries](https://apprais.ai/learn/all-appropriate-inquiries/)

## Other Property Types

Phase 1 ESA costs vary by what is on the site. Other property types we track: [Agricultural / Farm](https://apprais.ai/phase-1-environmental-cost/agricultural/), [Assisted Living / Senior Housing](https://apprais.ai/phase-1-environmental-cost/assisted-living/), [Auto Repair / Body Shop](https://apprais.ai/phase-1-environmental-cost/auto-repair/), [Brownfield](https://apprais.ai/phase-1-environmental-cost/brownfield/), [Church / Religious Facility](https://apprais.ai/phase-1-environmental-cost/church/), [Data Center](https://apprais.ai/phase-1-environmental-cost/data-center/), [Dry Cleaner](https://apprais.ai/phase-1-environmental-cost/dry-cleaner/), [Funeral Home / Mortuary](https://apprais.ai/phase-1-environmental-cost/funeral-home/).

[Compare Shooting Range Phase 1 ESA costs across property types and states in the Phase 1 ESA Cost Index →](https://apprais.ai/phase-1-environmental-cost-index/)
